Projects

Project Type 

Project name 

Project Manager 

Date


Bugget

BAP


Investigation of surface coating of micronized calcite in a stirred ball mill and the effect on different mineral filler mixtures on dispersion and mechanical properties of polymer

 

Prof. Dr. Ö. Yusuf TORAMAN

2022-

17350

BAP

 

Investigation of the Impact Mechanism and Potential for Use of grinding aids in Grinding of Marble Powder Wastes

 

Assoc. Prof. Dr. Diler Katırcıoğlu BAYEL

2020-2023

30000

TÜBİTAK


Investigation of the Effects of Water Saturation on the Change of Force and Specific Energy Values in Clay-Rich Rocks by Using Rock Cutting Experiments

 

 

Assoc. Prof. Dr. Ramazan ÇOMAKLI

2020-2023

487.000

AB Projesi

Investigating the Microwave Assisted Cutting of Carbonate Rocks/MIWACUT 

Assoc. Prof. Dr. Ramazan ÇOMAKLI

2019-

720.000

 TÜBİTAK


Investigation of Usage of Waste Materials and By-Products as Grinding Aids in Grinding of Calcite

 

 

Assoc. Prof. Dr. Serkan ÇAYIRLI  

2019-2022

465.000

BAP


Surface Modification of Calcite, Talc and Pumice in a Stirred Ball Mill

 

Assoc. Prof. Dr. Serkan ÇAYIRLI  

2018-2021

16.434

BAP

 

Determination of Physical and Mechanical Properties of Niğde Region Calcite and Limestones and Investigation of Their Use in Various Sectors

Prof. Dr. Ö. Yusuf TORAMAN

2019-2020

16,618

TÜBİTAK


Evaluation of the performance of the roadheaders used in the excavation of rock-cut structures and development of a new performance prediction model

Assoc. Prof. Dr. Ramazan ÇOMAKLI

2018-2019

28.600

 

 

 

 

 

BAP


Implementation Of Roasted Process As Pretreatment In Refractory Gold And Silver

 

Assist. Prof. Dr. Emine YOĞURTCUOĞLU

2019- 

19,999 

BAP


Effect of microwave pretreatment on cyanide leaching process in polymetallic refractory Au / Ag ore

 

Assist. Prof. Dr. Emine YOĞURTCUOĞLU

2019- 

19,999 

BAP

 

Optimization of Grinding Parameters with Experimental Design Method in Mineral Filler Production

Assoc. Prof. Dr. Diler Katırcıoğlu BAYEL

2017-2020

15.000


For 2019 and previous projects;


Latest Update:06.11.2023