| 1 | Paths followed in the preparation of the project and expectations | [21], s. 1-20 |
| 2 | Water intake structures and design principles | [ 1 ] s. 269 - 288, [ 3 ], s. 320 - 321. |
| 3 | Water intake structure design, project data, and we wanted | |
| 4 | Water intake structure design, project delivery and control | |
| 5 | Bindings and design principles | [ 1 ] s. 164- 211, [ 3 ], s. 223 - 235. |
| 6 | Fixed linking project data, and we wanted | |
| 7 | Fixed linking project design | |
| 8 | Fixed linking project delivery and control | |
| 9 | Energy degrading structures and design principles | [ 1 ] s. 250 - 268, [ 3 ], s. 203 - 222. |
| 10 | Energy crusher building design and project data we wanted | |
| 11 | Energy hammer construction project delivery and control | |
| 12 | Bridges, culverts and akedükler and design principles | [ 1 ] s. 152 - 163, [ 3 ], s. 345 - 373, [ 4 ], s. 99 - 364. |
| 13 | The bridge hydraulics, culvert and / or project design data and the requirements akedük | |
| 14 | The bridge hydraulics, culvert and / or akedük design and project control | |